![](https://www.surfacingsystems.co.uk/wp-content/uploads/2021/06/PHOTO-2021-05-18-10-36-46-800x500.jpg)
![](https://www.surfacingsystems.co.uk/wp-content/uploads/2017/12/St-Marys-Saint-Reading.jpg)
Project Description
In late September, the team completed the installation of 88m2 of wet pour surfacing at St Mary & All Saints C of E Primary School in Reading.
The project involved the uplifting and recycling of existing wet-pour surfacing, followed by the installation of a new MRI Polytech wet-pour system, with the product depth suited to the existing equipment onsite.
The surface finish was a black EPDM rubber with 25% blue EPDM fleck.